D1.4 | Final report | CEA | 2021-10 |
D1.5 | Impact report and collaboration plan | CEA | 2021-10 |
D5.6 | Integration and system level testing of proof-of-concept phase 2 | ETRI | 2021-10 |
D6.4 | Dissemination activity report Y3 | FhG | 2021-10 |
D6.8 | Report on standardization activities Y3 | TAS | 2021-10 |
D6.11 | Report on exploitation Y3 | GEM | 2021-10 |
D5.5 | Integration and system level testing of proof-of-concept phase 1 | TAS | 2021-09 |
D5.2 | Integration and system level testing for European testbed of 5G cellular and satellite access networks | TAS | 2021-06 |
D5.4 | Integration and system level testing for Korean multi-connectivity | KATECH | 2021-06 |
D4.3 | Implementation of the multi-RAT load balancing algorithms and technical specifications of the relevant interfaces | CRAT | 2021-04 |
D3.3 | Interference mitigation techniques | TAS | 2020-10 |
D5.3 | Integration and system level testing for Korean testbeds of 5G cellular and satellite access networks | ETRI | 2020-08 |
D2.5 | Business assessment for vertical markets empowerment | GEM | 2020-07 |
D6.3 | Dissemination activity report Y2 | FhG | 2020-06 |
D6.7 | Report on standardization activities Y2 | TAS | 2020-06 |
D6.10 | Report on exploitation Y2 | GEM | 2020-06 |
D2.4 | Final document of service scenarios/applications for PoC | GEM/ETRI | 2020-02 |
D2.3 | Final document of 5G-ALLSTAR architecture, API, interface specifications and KPIs for PoC | CRAT/ETRI | 2020-01 |
D1.2 | First periodic report (no public deliverable)
| CEA | 2019-12 |
D3.2 | Interference analysis for terrestrial-satellite spectrum | FhG | 2019-12 |
D4.2 | Design and simulation of the multi-RAT load balancing algorithms | CRAT | 2019-12 |
D6.9 | Plan for exploitation towards Vertical stakeholders | GEM | 2019-12 |
D3.1 | Spectrum usage analysis and channel model | FhG | 2019-06 |
D5.1 | Specification of the European testbed of 5G cellular and satellite access networks | TAS | 2019-06 |
D6.2 | Dissemination activity report Y1 | FhG | 2019-06 |
D6.6 | Report on standardization activities Y1 | TAS | 2019-06 |
D2.2 | Preliminary document of 5G-ALLSTAR architecture, API and interface specifications | CRAT/ETRI | 2019-04 |
D4.1 | Mapping of multi-connectivity functions onto the 5G network architecture | CRAT | 2019-04 |
D6.5 | Standardization Action Plan | TAS | 2018-12 |
D2.1 | 5G-ALLSTAR vision document: Vision, Scope and Goals | FhG | 2018-10 |
D1.1 | Quality plan | CEA | 2018-09 |
D6.1 | Dissemination plan, and project website | FhG | 2018-09 |
D6.12 | Data management plan | CEA | 2018-09 |